Live network coverage

Where Headroom can screen today.

Every GB network operator returns a cited verdict. Here is exactly which half of the picture is live in your patch.

UK Power NetworksFull screening
Northern PowergridVerdicts live
Electricity North WestFull screening
SP Energy NetworksFull screening
NGEDQueue live
SSENQueue live
Four of six groups fully screened · all six return a verdict · 14 licence areas
Coverage detail

What is live, network by network

NetworkSubstation headroomConnection queue
UK Power Networks
Eastern · London · South Eastern
Live, queried per screen Live, queried per screen
Northern Powergrid
North East · Yorkshire
Live, 1,881 substations Live, 2,755 connections
Electricity North West
North West England
Live, 367 primaries Live, 3,099 connections
SP Energy Networks
SP Distribution · SP Manweb
Live, 1,261 sites Partial, 1,306 connections
National Grid Electricity Distribution
Midlands · South West · South Wales
Building Live, 7,036 connections
SSEN
Scottish Hydro · Southern
Building Live, 5,625 connections

Two halves, filled in separately. A useful verdict needs two things: how much spare capacity the local substation has, and who is already in the queue for it. Every DNO publishes both, in a different format and on a different schedule. We ingest, validate and calibrate one at a time, and we would rather show you exactly which half is live in your patch than claim national coverage.

Why it matters

Around half of domestic applications come back export-restricted.

Across 136 applications in the domestic market, roughly one in two returned with an export restriction. Grid headroom is the single biggest variable in whether a solar or battery job completes, and the one an installer can least see before quoting.

Grid briefing

Five things worth knowing

7 Oct 2026You may soon be able to build the transmission connection to your site yourself.

On 7 October Ofgem opened a consultation proposing that demand, generation and storage customers could build all sole use assets from their site to the existing transmission system, including overhead lines and project substations, and then transfer them to the Transmission Owner. Today that option is mainly limited to sites within 2km of the existing system, so it is not available to most connecting customers.

Stakeholders have cited cost savings in the region of 20%, and one to two years saved where no reinforcement work is needed. It is a consultation, not a decision. The response deadline was extended to 16 November 2026, after which Ofgem will decide what, if anything, to change.

23 Oct 2026The spatial plan that will guide where generation, demand and networks are built slips to the end of 2027.

On 23 October the Department for Energy Security and Net Zero published a formal direction requiring the National Energy System Operator to submit the first Strategic Spatial Energy Plan by 31 December 2027 instead of 31 December 2026. The minister’s letter of 20 October says the extra time is to let the modelling reflect updated generation cost estimates, including cost of capital, more recent demand expectations, and wider policy interdependencies.

If you are screening sites against future spatial targets, the first official plan will not now be submitted until the end of next year. The direction applies only to the first plan, and it formalises a timeline revision first set out on 4 December 2025 rather than announcing a new delay.

28 Oct 2026Capacity in the queue you are screening can be reserved and reallocated to strategic demand.

On 28 October the government confirmed it will proceed with powers for NESO to prioritise demand projects that ministers identify as strategic. Capacity released when projects leave the queue can be reallocated to those projects, future capacity can be reserved for strategic projects that are not yet ready, and ready strategic projects can be given higher priority when future queues are formed.

The government also intends to align data centre connections after 2030 to regional infrastructure targets, which will limit the volumes that can connect in each region. This is an intention to proceed rather than a change already in force: the final legal texts and the directions to NESO are still to be published. The measures are intended to be in place before the next NESO application window, operated through the Connections Accelerator Service.

11 Nov 2026A 2GW Scotland to England link has cleared its Scottish marine licence.

On 11 November a marine licence was granted for the Scottish waters section of Eastern Green Link 3, including the nearshore works where the cable will meet land near Peterhead in Aberdeenshire. Ofgem describes EGL3 as a 2GW high voltage direct current link between Peterhead and Walpole in Norfolk, built as a joint venture between SSEN Transmission and National Grid Electricity Transmission.

SSEN says it will provide additional network capacity to help relieve constraints and connect renewable generation. The licence granted covers Scottish waters only, and no completion date is claimed here. On 30 October Ofgem opened a separate consultation, closing on 30 November 2026, on a second early construction funding application for the same project.

12 Nov 2026Constraint costs on the network you are screening against are forecast at £3.9bn in 2027.

On 12 November NESO’s Chief Economist published the third part of the Balancing Act series, forecasting thermal constraint costs of £3.9bn in 2027 against £2.0bn in 2025/26. Thermal constraints arise when transmission lines cannot safely carry all the available power, and already make up around two thirds of total balancing costs. NESO estimates the 2027 figure would be 16% lower without the network outages needed for reinforcement.

In its net zero pathways NESO projects 2030 thermal constraint costs of £6.8bn to £7.7bn if clean generation is delivered but planned reinforcement is not accelerated. These are forecasts and scenarios, not outturn. When you screen a site, a rising forecast is a reminder that location affects curtailment risk and the value of a connection date.

Every figure on this page comes from a third-party publisher and is reproduced as published. Data sources and accuracy.