Screen a site against live DNO data in 60 seconds, solar, battery, heat pump, EV or wind, and get a clear verdict across all six GB network operators. Then generate a submission-ready G98/G99 pack the same day. No bureau: cheaper, faster, and you keep control.
For any job that touches G99, battery, commercial, or a constrained network, the DNO approval happens after the sale: weeks of limbo, sometimes a "no". That's the No. 1 blocker installers name, whatever the technology.
From 27 August, plug-in solar adds a large volume of small, notifiable generation. Small does not mean exempt: an 800 VA plug-in unit is grid-connected generation and the G98 notification still applies. Your customers will ask you about it. What the rules actually say
From a postcode to a lodged application, at the kitchen table.
Steps 1 to 4 are live and included across up to 10 domestic or commercial sites with a free account, including saving and ranking a portfolio. Step 5 costs from £39 a pack, or is included in your monthly plan. Step 8 is on the roadmap.
Live grid capacity and a cited verdict. Included in your 10 free sites.
The pack knows your site. Complete the gaps and go.
Complete, e-sign and lodge through your DNO portal. No bureau, no weeks of waiting to start.
Nobody else covers the whole journey. Most cover one step of it.
A screening tool tells you what the map says. An application service fills in the form once you have already decided. Headroom is the only one that takes a site from a postcode to a lodged application, and the only one where the first four steps cost nothing.
Queue positions are increasingly something you evidence rather than reserve. Ofgem's connections reform is steadily removing projects that cannot show they are ready, and the capacity picture moves with it. Screening live is how you find out where you actually stand. What is changing
Your 10 free sites can be domestic, commercial or any mix, across every technology and network operator, with each site saved and ranked. You pay only when you generate an application, from £39 a pack, or from £99 a month.
Every GB network operator returns a cited verdict, with the depth of data varying by operator. A screen never comes back blank: where a substation verdict is not yet available it says so plainly and returns live connection-queue and export-restriction data instead. Network Status shows exactly what is live where.
Live substation headroom and connection-queue data taken direct from the network operators, plus PVGIS yield. The source and its as-at date are cited on every verdict.
EREC G98 / G99 Issue 2 / G100-aware. Registered with the ICO (ZC221029) and operated under UK GDPR - see the Privacy Policy.
Every recorded DNO outcome sharpens future verdicts. Data no competitor has.